Eight chiller water boxes blasted and recoated inside a working data center.

chiller water boxes before
chiller water boxes after
AfterBefore

Drag the handle to compare before and after.

The project

What we did

DuPont Fabros’ SC1 is one of the most advanced and efficient data centers in the San Francisco Bay Area, a 360,000-square-foot building made for critical power.

We were hired to recoat 8 of its chiller water boxes. They keep the equipment in the building at the right temperature, so they matter.

First we set up full containment with air filtration to catch the dust from blasting. Then we blasted every surface to SSPC SP-10 and applied Enecon paste, a base coat and a final coat, all to the client’s specs.

Projects

More projects like this

  • Namasco / Kloeckner Metals
    Epoxy crane coatingNamasco / Kloeckner Metals
    Gantry crane blasted and coated in epoxy.
  • Sierra Silica Resources
    Corrosion controlSierra Silica Resources
    Ten 30,000-gallon tanks and silos, plus steel I-beams.
  • Flare stacks