The difficult jobs, the challenges behind them, and how we solved them.

  • loading tower stairs before
    loading tower stairs after
    AfterBefore
    Corrosion Control Coatings

    Green Diamond

    Corrosion control and protective coating of a 160-foot ship-loading tower in a severe coastal environment.

    The challenge
    Near-constant rain, marine exposure, difficult access, and active vessel operations complicated every phase of the work.
    The result
    Completed on time and on budget with zero safety incidents, extending protection of the tower and supporting steel.
    See the case study
  • fan housing before
    fan housing after
    AfterBefore
    Coating repair

    NOAA, San Diego

    Urgent corrosion repair and recoating of a critical exhaust fan at NOAA’s Southwest Fisheries Science Center.

    The challenge
    Severe marine corrosion, sensitive surrounding equipment, tight fan tolerances, and an opening deadline days away.
    The result
    Extensive corrosion was repaired and protected with a 3-coat DTM system, with the expanded work completed ahead of schedule.
    See the case study
  • The Capitol Records Building after Raider’s exterior recoat
    Exterior recoat

    Capitol Records

    Exterior restoration and recoating of approximately 51,000 square feet on the iconic 13-story Capitol Records Building.

    The challenge
    Circular architecture, difficult access, varied surface deterioration and persistent rain complicated repairs and coating application.
    The result
    The building’s exterior was repaired, recoated and protected, restoring a clean, consistent appearance to the landmark tower.
    See the project
  • The finished chemical resistant floor in the mortuary’s embalming area
    Chemical resistant coatings

    Mortuary Deck

    Replacement and recoating of a second-floor mortuary floor while the facility remained in operation.

    The challenge
    Concealed deck conditions, contamination control, waterproofing, and a finish resistant to formaldehyde.
    The result
    A new sloped, sealed epoxy floor was completed on schedule and within budget without interrupting business operations.
    See the case study
  • Coated structural steel high on San Francisco’s Sutro Tower
    Epoxy coatings

    Sutro Tower

    Corrosion remediation and protective coating of the interior structural steel at San Francisco’s 1,000-foot Sutro Tower.

    The challenge
    Extreme vertical access, confined work areas, and constant coastal fog made logistics, preparation, and coating especially difficult.
    The result
    The first two legs were completed on time and within budget, extending protection of the structural steel and earning additional project phases.
    See the case study

More case studies

Other Challenges. Proven Solutions.

More jobs backed by our experience.

  • Garage deck coating

    Wilshire Rodeo Parking

    Wilshire Rodeo Plaza needed restoration of the coated concrete floor in its underground parking and valet area in Beverly Hills. Raider Painting removed the existing coating and prepared the concrete for a new high-traffic epoxy flooring system. The work included mechanical surface preparation, coating of the driving and parking areas, and new pavement markings. Entrance and exit ramps also received added aggregate for a non-skid surface.

    The challenge
    The existing floor coating first had to be mechanically removed before the concrete could be properly prepared. The surface was shot-blasted to clean and profile the concrete, while high areas were corrected with diamond grinding. The new flooring needed to withstand the demands of a high-traffic parking and valet area while providing a finished appearance appropriate for the Beverly Hills retail and office property. Careful preparation was essential to the performance and appearance of the completed system.
    The result
    Raider installed a dense, high-traffic epoxy flooring system designed for long-term service, with sand aggregate added at the entrance and exit ramps for improved traction. Parking stalls, accessible spaces, and traffic markings were repainted to complete the restoration. The project was completed on time and within budget. The client praised Raider’s project management and the finished valet area, noting that the completed space was well suited for its high-end retail and office visitors.
    See the project
  • Deck coating

    Helipad

    Raider Painting restored a worn aluminum helipad deck with a specialized waterproofing and anti-skid coating system. The project included complete surface preparation, seam sealing, patching, coating, and detailed landing markings. Multiple coating layers and aggregate provided the durable, slip-resistant surface required for the deck. Final markings and identifiers were completed in accordance with FAA-approved requirements.

    The challenge
    The aluminum deck required a different preparation approach than a conventional concrete or steel surface. Magnetic shot-blasting equipment was used to remove the existing coating, followed by thorough removal of remaining blast media from between the aluminum panels. Panel seams also required individual attention, along with extensive patching and sanding to create a level surface. Proper preparation was critical before the new waterproofing and anti-skid system could be installed.
    The result
    The completed deck received a 100% solids epoxy coating system with aggregate broadcast to refusal, followed by a polyurethane finish coat in the specified color. Every panel seam was sealed with elastomeric polyurethane caulking to complete the waterproofing work. An artist laid out the helipad circles, while Raider’s crew completed the markings, insignias, landing identifiers, and stenciled numbers. The finished helipad combined a renewed, durable deck surface with the required FAA-approved markings.
    See the project
  • High temperature coatings

    Weber Metals

    Weber Metals is home to a massive 12,000-ton press requiring specialized coatings for an extreme industrial environment. Raider Painting provided coating work on the press as well as its large grease pit. The selected coating system needed to withstand temperatures reaching 1,000°F. The project combined demanding surface conditions with very limited application windows.

    The challenge
    Extreme operating temperatures and short application windows made coating selection, preparation, and execution especially important. The grease pit presented an additional challenge because contaminants had to be thoroughly removed before coating could begin. The surface then required careful preparation to provide proper adhesion for the new system. With conditions this demanding, conventional coatings and preparation methods were not sufficient.
    The result
    After cleaning and preparing the surfaces, Raider applied a specialized epoxy coating system capable of withstanding temperatures up to 1,000°F. The grease pit received the same attention to cleaning and surface preparation before application of the protective coating. The completed work provided a coating system suited to the unusually demanding conditions surrounding the press. Raider successfully completed specialized coating work on one of the most distinctive pieces of industrial equipment in the facility.
    See the project
  • Steel Structural Coatings

    UPRR Colton Yard

    Raider Painting completed a broad range of commercial and industrial coating work under a two-year contract at Union Pacific Railroad’s Colton facility. The scope included structural steel protection, specialized deck systems, and high-performance anti-skid coatings in critical work areas. Hundreds of individual coating applications required thousands of gallons of specialized materials across the large facility. The work combined demanding coating requirements with the operational challenges of an active railroad yard.

    The challenge
    Working around active railroad operations required strict safety protocols, careful planning, and constant schedule flexibility. Work stopped when trains were moving through designated areas, while crossing active tracks could delay crews and equipment for hours. Structural steel coating also faced aggressive deadlines, requiring near-round-the-clock application shifts to maintain the schedule. At the same time, surface preparation and coating work had to meet the requirements of each individual application.
    The result
    Over the course of the contract, Raider completed extensive structural steel, deck, and anti-skid coating applications throughout the facility. Rapid-cure deck systems helped minimize downtime in high-traffic areas, while mechanical surface preparation provided the proper profile for long-term coating adhesion. Anti-skid systems improved critical work areas where slip hazards were a concern. The project delivered long-lasting protection across a large, active industrial facility while working within demanding operational and access constraints.
    See the project

Projects

More projects

  • Wilshire Comstock
    Elastomeric waterproofingWilshire Comstock
    Twin 22-story towers, coated in 1999 and again in 2011.
  • Capitol Records Building
    Exterior recoatCapitol Records Building
    About 51,000 sq. ft. on the 13-story landmark.
  • Union Pacific Colton Yard
    Anti-skid coatingsUnion Pacific Colton Yard
    Steel, deck and anti-skid coatings over two years.