It is important to complete frequent maintenance on parking garages in order to extend the lifetime of existing parking structures and maintain a clean, useful presence for the public who park inside your garage.

This encompasses both steel and concrete rehabilitation. A parking garage refurbishment firm can arrive on site and make these parking garage repair evaluations on your behalf and structure an annual program for the parking garage.

Types of restoration that might be carried out are: overhead concrete replacement, full-floor concrete replacement, post-tension and post-tension repair, carbon fiber installation, steel plating and bracing, concrete installation, plaza rehabilitation, deck waterproofing systems, including joint sealants, traffic deck coatings, concrete sealers and expansion joint sealing systems.

Maintenance of the parking garage is key. Areas to check out in maintenance of parking structures are; structural systems: floors in parking garages can be evidence for cracks, expansion joints, unevenness across cracks, delaminating of concrete, shifting in the floor surfaces. It is good to examine drain areas where water settles in a parking garage. Inspection of floors of parking garages ought to be each three months.

Framing components in the parking garage are comprised from the building and columns, beams and spandrel panels. These are often constructed of steel, concrete or steel-encased concrete. Check out places where the concrete has cracked and where the reinforcing materials are uncovered and deterioration has set in. Framing components in a parking structure ought to be checked every three months.

Walls and towers in parking garages ought to be level. If you see cracking within the wall surfaces, stair treads become misaligned or the expansion joints might open up. Walls and towers of parking garages and concrete parking structures should be checked quarterly.

Connections in a parking garage are places where the structural system components are bolted, welded or grouted in place and should be carefully examined for deterioration, cracking, spalling or distress. Connections should be inspected on a quarterly basis.