
Machinery coatings
Gerald Desmond Bridge Replacement Project


Drag the handle to compare before and after.
The project
What we did
The Gerald Desmond Bridge replacement was an extensive project that we were delighted to be a part of. We applied an epoxy coating system to the bridge’s oscillator and generator. We first prepped the surfaces with a brush blast to create a profile to maximize adhesion of the coating. We then applied Sherwin Williams Macropoxy, a 2 part epoxy coating system.
Photos
From the job
From prep to the finished work. Click a photo to see it larger.
Projects



