Half Moon Bay Well Heads

The Sewer Authority Mid-Coastline (SAM) hired Raider to refurbish and coat their well head works, various piping, holding racks, pumps and concrete pads. We required that SAM de-energize and lock-out/tag-out the units prior to our work commencing. Raider prepped the surfaces to SSPC SP2/3, hand/power tool cleaning. Next we coated the steel surfaces with 2 coats of rust inhibiting epoxy primer and followed with a UV protective urethane top coat.